342 editable slides for charts, frameworks, team pages and strategic storytelling — built for consultants who need board-ready decks fast.
342 slidesLight + darkPowerPoint + Google Slides4 sample presentations
★★★★★ 4.9 · 5,000+ professionals · future updates included



★ 4.9 rated
⚡ Toggle dark in 1 click
Charts, frameworks, timelines, org charts and dashboards — a live scroll through the actual library.
Complete client narratives — not loose slides. Open a deck and flip through every layout before you buy.
342
Editable slides
4
Sample presentations
2
Light + dark themes
∞
Future updates
Draft the thinking with Claude or ChatGPT, drop it into the matching SlideStart layout, and hand clients a polished deck in a fraction of the time.
Give Claude your brief and the framework — SCQA, the Pyramid Principle, a 2×2. Starter prompts ship with the kit.
It returns a slide-by-slide outline with client-ready headlines and chart callouts.
Paste into the matching SlideStart slide — design, charts and theme already built.
Your prompt
Draft a consulting proposal — situation, three options, a 2×2, and a recommendation. Use the Pyramid Principle.
AI outline
1 · Situation & mandate 2 · Three options 3 · Options on a 2×2 4 · Recommendation 5 · 90-day plan
Finished slide

What you'd pay for this separately
342 slides, charts & frameworks — $390
4 ready-made sample presentations — $160
AI framework prompt pack — $60
Future updates — $90
Total value — $700
Yours today — just $199
Instant download · PowerPoint + Google Slides · 342 slides, light & dark · commercial license · future updates
🛡️ Secured by Stripe · instant download
You're viewing Consulting Proposal. Add Corporate Strategy and Business Case — all three consulting kits, sample decks and prompts in one purchase.
“Cut my client proposal prep from a full day to an afternoon. The frameworks are exactly what clients expect.”
Elena Marsh · Strategy Director, Meridian
“The sample presentations alone paid for it — I adapted the consulting proposal for a live client meeting in an hour.”
David Osei · Founder, Northlight Advisory
Both .pptx (PowerPoint) and Google Slides — a downloadable file plus a direct Slides link. 16:9 and 4:3.
Every slide is fully editable. The Slide Master gives global theme control — update your brand colors once, applied across all 342 slides.
Yes. The commercial license covers client presentations, board reports and investor pitches — unlimited projects.
Yes — new slides, layouts and chart types, free, delivered to the same download link in your account.
Draft your content with Claude or ChatGPT using the included framework prompts, then paste it into the matching layout — the design is already done.
342 slides, four demo decks, and AI-ready prompts. Build your next consulting deck in minutes.
Get this template — $199